Welcome to our earthship Earthship Get Started Book Recently Asked Questions The Build Planning The Big Dig Tyring Work 2 May 07 9th May 07 17 & 18 May 07 23 May 07 30 May 07 20 June 07 27 June 07 5 July 07 13 Sep 07 6 Dec 07 2 & 3 Nov 07 18 Oct 07 4 Oct 07 24 & 25 Sep 07 20 Sep 07 10 Jan 08 17, 18 & 19 Jan 08 7 Feb 08 20 Feb 08 28 Feb 08 8 Mar 08 10 Jan 09 19 Feb 09 26 Feb 09 Aug 2013 Adios my friends Putting the lid on Materials Time Out Articles Greenhouse Geodesic Dome Interior Gallery Earthship in the news Diary Recipes Earthship Living Ethical Fashion Links Books Contact us ![]() |
Tyring WorkThe main material for the walls of an Earthship - tyres filled with earth. Each tyre, once filled, becomes a solid, mass 'brick' wide enough to negate the need for foundations - they ARE the foundations! They're pounded in place because once done they weigh a ton. The earth is from the site and the tyres we picked up free from the local garage. Because our soil is so dry we had to add a bit of water so it stuck together well. But even so, we used a fraction of the water we would've needed if we were using conventional bricks and mortar. The main hut, sited along a terrace wall to benefit from the sloping land, has been dug down 1.8m which meant we only had to do three rows of tyres along the back wall. The finished ceiling height is approximately 2.4m which allows for the bond beam. See below for a quick overview of the whole process or the menu to the left shows all the entries to the blog. Cuevas 1 - the one bedroom hutThe very first tyres started on the 2nd May 2007! This is the wall between the main room and the round room. Tyres were part dug into the earth at the join to make a really strong bond.
The turning of the corners! It was during the back wall process that we realised we couldn't do more than 7 tyres a day between the two of us, ho, hum.
The west wall finished, we then had to back track and add an extra layer to the back wall to allow for the pitch of the roof. And do the tyres for the round room join and front face.
The round room tyre work and the main area finished.
![]() |
![]() ![]() ![]() |